On this project we have been responsible for construction of FRC Distribution Kiosk, transformer bunds, Chemical tank Bund and other FRC structures around the site. We have poured over 380 m3 of concrete and installed over 65 t of Reinforcement
Our works Included:
Installation of Heave protection
Installation of Root Protection
Fixing Reinforcement
Installation of formwork
Pouring concrete to bases and walls
Works Value exceeded £ 200 k on LO basis
Contract Value
£200k
Principal Contractor
FRC Distribution Kios