Gornal
Package
The objective of the Lower Gornal works was to improve the quality of the effluent to achieve the new AMP7 Water Framework Directive (WFD) phosphorus and ammonia permits set out in the National Environmental Programme (NEP).
TCL structures was appointed to Construct Various RC structures around the site to accommodate required improvements.
Our works included construction of TAR slabs, TSR Backwash slabs, Dosing Kiosks, and other various RC structures including external Hardstanding
Concrete Poured
400m³
Principal Contractor
Principal Contractor JN Bentley
...
Albrighton
Albrighton
PackageIn order to achieve the tightening regulatory phosphorous and iron permits, Severn Trent Water required the construction of a two-lane reinforced concrete oxidation ditch at Albrighton Water Treatment Works.
The structure consisted of two interconnected octagonal tanks, each with internal baffle walls and shared inlet and outlet chambers. The main concrete pours were 161m³ to the base slab and 337m³ to internal and external walls. A proprietary wall formwork system was externally sourced.
Principal Contractor
Severn Trent Water
Concrete Poured
161m³
ALBRIGHTON8
...
Paradise View
Paradise View
Our order rom BAM Construction was for the provision of all labour, plant, and small tools to carry out preparatory groundworks and subsequent laying of external paving over an area of 790m² aspart of the refurbishment of a large existing office building in central Birmingham.
This included all necessary cutting and trimming around existing trees and structures, with an order value exceeded £145,000.
Contract Value
£145000
Principal Contractor
BAM Construction
Bam1
Bam2
Bam3
Bam4
Bam5
Cannon House
Cannon House
PackageOur order from Galliford Try was for the provision of all labour, plant, materials, and supervision to carry out concrete infills to existing slabs as part of the refurbishment of an existing office building in central Birmingham.
This included drilling and fixing dowels, erection of falsework, preparation of existing surfaces and openings, and the construction of three new in situ concrete staircases. The order value for these works exceeded £460,000.
Contract Value
£460,000
Principal Contractor
Galliford Try
canon house1
canon house2
...
Hampton Loade
Hampton Loade
On this project we have been responsible for construction of FRC Distribution Kiosk, transformer bunds, Chemical tank Bund and other FRC structures around the site. We have poured over 380 m3 of concrete and installed over 65 t of Reinforcement
Our works Included:
Installation of Heave protection
Installation of Root Protection
Fixing Reinforcement
Installation of formwork
Pouring concrete to bases and wallsWorks Value exceeded £ 200 k on LO basis
Contract Value
£200k
Principal Contractor
FRC Distribution Kios
Hampton Loade1
Hampton Loade2
Site Projects
On Site Projects
Pitts MillThe provision of all labour, plant, and small tools for the construction of a new 12m diameterconcrete storm tank base at Pitts Mill water treatment works. The order from On Site Servicesexceeded £21,100.
NewentThe provision of all labour, plant, and small tools for the construction of a new 4.5m diameterconcrete storm tank base at Newent water treatment works. The order from On Site Servicesexceeded £13,700.
Lighthorne HeathThe provision of all labour, plant, and materials for the construction of a new 11m diameter concretestorm tank base at Lighthorne Heath water...