Gornal Package The objective of the Lower Gornal works was to improve the quality of the effluent to achieve the new AMP7 Water Framework Directive (WFD) phosphorus and ammonia permits set out in the National Environmental Programme (NEP). TCL structures was appointed to Construct Various RC structures around the site to accommodate required improvements.  Our works included construction of TAR slabs, TSR Backwash slabs, Dosing Kiosks,  and other various RC structures including external Hardstanding  Concrete Poured 400m³ Principal Contractor Principal Contractor JN Bentley ...

Continue reading

Albrighton

Albrighton PackageIn order to achieve the tightening regulatory phosphorous and iron permits, Severn Trent Water required the construction of a two-lane reinforced concrete oxidation ditch at Albrighton Water Treatment Works. The structure consisted of two interconnected octagonal tanks, each with internal baffle walls and shared inlet and outlet chambers. The main concrete pours were 161m³ to the base slab and 337m³ to internal and external walls. A proprietary wall formwork system was externally sourced. Principal Contractor Severn Trent Water Concrete Poured 161m³ ALBRIGHTON8 ...

Continue reading

Paradise View

Paradise View Our order rom BAM Construction was for the provision of all labour, plant, and small tools to carry out preparatory groundworks and subsequent laying of external paving over an area of 790m² aspart of the refurbishment of a large existing office building in central Birmingham. This included all necessary cutting and trimming around existing trees and structures, with an order value exceeded  £145,000. Contract Value £145000 Principal Contractor BAM Construction Bam1 Bam2 Bam3 Bam4 Bam5

Continue reading

Cannon House

Cannon House PackageOur order from Galliford Try was for the provision of all labour, plant, materials, and supervision to carry out concrete infills to existing slabs as part of the refurbishment of an existing office building in central Birmingham. This included drilling and fixing dowels, erection of falsework, preparation of existing surfaces and openings, and the construction of three new in situ concrete staircases. The order value for these works exceeded  £460,000. Contract Value £460,000 Principal Contractor Galliford Try canon house1 canon house2 ...

Continue reading

Hampton Loade

Hampton Loade On this project we have been responsible for construction of FRC Distribution Kiosk, transformer bunds, Chemical tank Bund and other FRC structures around the site. We have poured over 380 m3 of concrete and installed over 65 t of Reinforcement Our works Included: Installation of Heave protection Installation of Root Protection Fixing Reinforcement Installation of formwork Pouring concrete to bases and wallsWorks Value exceeded £ 200 k on LO basis Contract Value £200k Principal Contractor FRC Distribution Kios Hampton Loade1 Hampton Loade2

Continue reading

Site Projects

On Site Projects Pitts MillThe provision of all labour, plant, and small tools for the construction of a new 12m diameterconcrete storm tank base at Pitts Mill water treatment works. The order from On Site Servicesexceeded £21,100. NewentThe provision of all labour, plant, and small tools for the construction of a new 4.5m diameterconcrete storm tank base at Newent water treatment works. The order from On Site Servicesexceeded  £13,700. Lighthorne HeathThe provision of all labour, plant, and materials for the construction of a new 11m diameter concretestorm tank base at Lighthorne Heath water...