Paradise View

Paradise View Our order rom BAM Construction was for the provision of all labour, plant, and small tools to carry out preparatory groundworks and subsequent laying of external paving over an area of 790m² aspart of the refurbishment of a large existing office building in central Birmingham. This included all necessary cutting and trimming around existing trees and structures, with an order value exceeded  £145,000. Contract Value £145000 Principal Contractor BAM Construction Bam1 Bam2 Bam3 Bam4 Bam5

Continue reading

Cannon House

Cannon House PackageOur order from Galliford Try was for the provision of all labour, plant, materials, and supervision to carry out concrete infills to existing slabs as part of the refurbishment of an existing office building in central Birmingham. This included drilling and fixing dowels, erection of falsework, preparation of existing surfaces and openings, and the construction of three new in situ concrete staircases. The order value for these works exceeded  £460,000. Contract Value £460,000 Principal Contractor Galliford Try canonhouse 4 canonhouse 5 ...

Continue reading

Hampton Loade

Hampton Loade On this project we have been responsible for construction of FRC Distribution Kiosk, transformer bunds, Chemical tank Bund and other FRC structures around the site. We have poured over 380 m3 of concrete and installed over 65 t of Reinforcement Our works Included: Installation of Heave protection Installation of Root Protection Fixing Reinforcement Installation of formwork Pouring concrete to bases and wallsWorks Value exceeded £ 200 k on LO basis Contract Value £200k Principal Contractor FRC Distribution Kios hamptonloade14 hamptonloade1 ...

Continue reading

Site Projects

On Site Projects Pitts MillThe provision of all labour, plant, and small tools for the construction of a new 12m diameterconcrete storm tank base at Pitts Mill water treatment works. The order from On Site Servicesexceeded £21,100. NewentThe provision of all labour, plant, and small tools for the construction of a new 4.5m diameterconcrete storm tank base at Newent water treatment works. The order from On Site Servicesexceeded  £13,700. Lighthorne HeathThe provision of all labour, plant, and materials for the construction of a new 11m diameter concretestorm tank base at Lighthorne Heath water...

Continue reading

Roundhill

Roundhill PackageRoundhill is a large Severn Trent wastewater treatment plant that is subject to tightened ammonia and phosphorous permits under AMP7. Our original order from Mott Macdonald Bentley was the supply of all supervision, labour, plant, temporary works, and equipment for the construction of the following reinforced concrete structures:- TSR Actiflo chamber pouring over 700m³ of concrete with 3,500m² of shuttering and fixing 208 tonnes of reinforcement Primary settlement tank 28m in diameter Final settlement tank 34m in diameter The original order value exceeded £1.15 million. Contract...

Continue reading

Newthorpe

Newthorpe PackageIn order to meet the requirements on effluent at Heanor Minhay and Newthorpe water treatment works as set out by the Water Framework Directive under the National Environmental Programme, it is necessary to transfer full treatment flow from Heanor to combined treatment at Newthorpe. Our order from Mott Macdonald Bentley is for the supply of all labour, plant, temporary materials, temporary works design, and supervision for the construction of new reinforced concrete inlet works to include the inlet chamber, detritor structure, flume, and high flow chamber. The original order...